Nikola Tesla Secret
Showing posts with label Build. Show all posts
Showing posts with label Build. Show all posts

Tuesday, 19 April 2016

Mid American Energy to Build Largest Wind Farm in Iowa

Mid American Energy is filing a request with the Iowa Utilities Board to build WIND 11, a project that will add up to 2,000 megawatts of wind generation in Iowa. Mid America’s Ruth Comer says their $ 3.6 billion investment is the largest economic development project in Iowa history.


She says those additional 1,000 wind turbines bring Mid American’s total to 3,000 wind turbines. Comer says Iowa will receive over 40 percent of its energy from wind once their Wind 11 project is completed.


Comer says Mid American Energy has great relations with Iowa’s farmers, landowners and local communities which has allowed them to move forward successfully with these projects.


Mid American Energy began their Iowa wind projects in 2004.



Mid American Energy to Build Largest Wind Farm in Iowa

Sunday, 20 March 2016

Access to build Uganda solar plant

Resources 


Saturday, March 19, 2016 




SPADE WORK: Stephene Bontemps, Amb. Schmidt and Lokeris perform the ground breaking for the construction of 10 MW solar plant in Soroti which will cost $18 million. (PHOTO BY SAMUEL NABWIISO)




SOROTI, UGANDA – The Minister of State for Mineral Development, Peter Lokeris last week invited more investors to take up development of renewable energy opportunities available in the country. 


“Most power investors prefer to invest in hydro-power technologies which is very expensive, leaving out the untapped solar energy opportunities in the country.  Over dependence on hydro-power will not solve the country’s energy problem. Let us diversify the power sector so that all parts of the country have access to clean energy,” he said.


He said Uganda has the favourable climatic conditions to support the production of solar power.


He was officiating at the ground-breaking for the construction of  a $18 million solar power plant  in Soroti, eastern Uganda. The plant is expected to generate 10MW  and is being developed by Access Power Company,  a United Arab Emirates-based company.


The 10MW  photovoltaic plant  is expected to be in operational  and  connected  to the national  grid by July  2016 providing  electricity to about 40,000 homes.


Spanish engineering firm, TSK Group, are carrying out construction after being awarded the Engineering  Procurement  and Construction  contract.


However TSK Group will  subcontract  part of the works to qualified local firms in the country.


The Head  the European Union Delegation to Uganda Ambassador Kristian Schmidt said access to clean energy by the local communities has multiplier effects on their social and economic development.


“Access to cheap and reliable  power is powerful engine towards supporting  the local communities to participate effectively  in the national economy. The  European Union will continue supporting Uganda’s power sector,” he said. 


Uganda currently has about 800 MW of installed  electricity supply , mostly  from hydro and thermal  sources.  The World Bank says Uganda has an 18.2% electrification rate.


Amb. Schmidt  said the Soroti solar power grid project will make a strong contribution to increasing access to clean energy in the region of which the greatest population depends on biomass, which  has negative environmental impact, especially forest cover.


Access Power Managing Director Stephene Bontemps applauded the various financial institutions which pulled resources together to fund the plant. The $18 million is a mix of debt and equity with the senior debt facility being provided by FMO, the Netherlands development bank, and the Emerging Africa Infrastructure Fund (EAIF).


By Samuel Nabwiso, Saturday, March 19th, 2016



Access to build Uganda solar plant

Friday, 27 November 2015

MLA Report: With the right leadership, we can build the energy future we want

There are few places in British Columbia that are more connected to power generation than Columbia River–Revelstoke. Home to considerable power projects like Revelstoke Dam, and part of the affected area of the Columbia River Basin, we understand this industry, and live daily with its benefits and consequences.


British Columbians have long benefitted from being owners of much of the power generated within this province, and through BC Hydro, a Crown Corporation that has traditionally provided significant dividends to the public purse, we have received access to consistent, low cost power.


Unfortunately, over the last 14 years under the BC Liberals, British Columbians have watched the cost of hydro skyrocket as government forced our Crown Corporation to make decisions that were not in the best interest of either BC Hydro or BC ratepayers.


It is time for British Columbians to make a new choice; a choice for better management of this precious resource, and better energy policy that protects rate payers, manages for sustainability, protects farmland, and moves us toward a green energy future.


Put forward by the BC NDP, PowerBC is a better plan for a brighter future for British Columbia. I believe that BC’s energy policy must be bold and progressive. We can protect BC Hydro customers from rising rates, produce good-paying jobs close to home, respect First Nations land title, and launch careers in clean energy and retrofit construction, maintenance, manufacturing and high-tech engineering.


PowerBC is about retrofitting public buildings, homes and businesses for energy efficiency, resulting in reduced energy costs and community-based jobs.


PowerBC is about maximizing current capacity in existing dams such as the Revelstoke Dam. Forward-thinking engineering built this structure for future capacity. We can still add one more turbine in Revelstoke Dam which would generate 500 megawatts of new capacity and create 390 person-years of skilled trades employment.


PowerBC is about making significant investments in clean energy. British Columbia is particularly well suited to produce renewable energy and could be an exporter of not only renewable energy, but of renewable energy technology.


Columbia River–Revelstoke has already embraced a diversity of energy production options that range from the SunMine in Kimberley to the bioenergy facility in Skookumchuk. Across British Columbia, there are tremendous opportunities for geothermal, wind, tidal and solar generation.


With the right leadership, we can build the energy future we want. If you want to learn more about PowerBC, go to bcndpcaucus.ca/powerbc.


Norm Macdonald is the MLA for Columbia River–Revelstoke. He can be reached at 1-866-870-4188 and norm.macdonald.mla@leg.bc.ca.



MLA Report: With the right leadership, we can build the energy future we want

Wednesday, 21 January 2015

Dominion Virginia Power looking to build first solar energy plant in the state

Norfolk, Va. – Dominion Virginia Power wants to build the first commercial solar energy plant in the state.


The company says it will save money in the long run, but first there will be a slight surge in customer bills.


If Dominion Power gets its way, a field of solar panels will be soaking up the sun in Northern Virginia by the end of 2016.


Dominion filed an application with the Virginia State Corporation Commission to build a $47 million solar energy plant in Fauquier County – the first in Virginia.


Dominion wants to temporarily raise customer’s bills by $.04 each month during construction and then drop $.02 per month once it’s built.


At peak capacity, the Remington Solar Power Plant could power 5,000 homes.



38.720879
-77.790978


Dominion Virginia Power looking to build first solar energy plant in the state

Thursday, 9 October 2014

DIY Projects for the Self-Sufficient Homeowner: 25 Ways to Build a Self-Reliant Lifestyle


Build your way to a more self-sufficient lifestyle with step-by-step projects for backup and supplementary utilities–including independent water, heat, and electricity–growing and storing food, raising small livestock, beekeeping, and more. Many of the projects require basic materials available at your everyday home center, but this book also provides valuable DIY resources for solar, hydro, greenhouse, and gardening needs. This book will help you build security with utility backup systems and become more sustainable, resulting in less dependence on city systems for basic needs. Whether you have a city plot or simply pots, this book includes all of the information needed to plan, build, and succeed with greater self-sufficiency.

Click Here For More Information



DIY Projects for the Self-Sufficient Homeowner: 25 Ways to Build a Self-Reliant Lifestyle

Tuesday, 22 July 2014

To Unlock Wind, Build Transmission Lines Linking the Plains to the Cities

A vital factor affecting the economics of any energy source is transportation: where is the fuel extracted, where is it used, and how does it get from point A to point B?


An example is the case of Texas versus North Dakota, both of which have experienced a boom in oil and gas production from shale since the introduction of hydraulic fracturing.


Texas, with its long history of oil and gas development, is riddled with underground oil and gas pipelines connecting remote areas of the state with regional trading hubs.



Many U.S. oil (red) and gas (blue) pipelines are clustered in and around Texas, which not only produces but also refines much of the country’s petroleum supply. Unconventional shale regions like Pennsylvania and North Dakota have significantly less oil and gas infrastructure. (Source: ProPublica)



North Dakota, on the other hand, was not traditionally a major oil and gas producer, so it has far less pipeline infrastructure in place than Texas. The result: between May 2012 and May 2013, $1 billion worth of natural gas was flared at well sites in North Dakota—burned off essentially as a waste product. For the most part, drillers in North Dakota operate a well to extract higher priced oil, which can be shipped via rail, albeit sometimes with disastrous results.


Fossil fuels are not the only energy source that can fall victim to transportation constraints. In fact, in many ways these constraints are far more onerous for renewable energy.


Like oil and gas resources, renewable energy regions are often located far away from major population centers. A prominent example is the U.S. wind belt, which stretches through the Great Plains from North Dakota to Texas. While this region is one of the greatest wind energy resources on the planet, it also happens to lie in the very center of the continental U.S., far from the coasts, where most Americans live.



The U.S. wind belt, which runs from North Dakota to West Texas through the Great Plains, is one of the greatest wind resources on the planet. However, it is located far away from major U.S. population centers, so transmission lines are needed to ship wind from the plains to the cities. (Source: NREL)



What makes renewable energy different from oil and gas is that renewable “fuel” (in the form of wind, water, or sunlight) is converted into electricity on-site, and, to date, there is only one feasible way to move lots of electric energy across the country: high-voltage transmission lines. If the requisite transmission infrastructure is not in place, a wind farm’s electricity output might have to be voluntarily turned down to avoid overloading what transmission lines do exist. And unlike the case of oil, no train or truck can come to the rescue.


Simply put, without the adequate transmission infrastructure in place, there is no way to bring wind energy from the plains to the cities, and wind will not produce at its full potential.


It seems like a no brainer then—build transmission lines. Unfortunately, a new transmission line can cost over $1 million per mile, and that’s for the equipment alone, before any of the NIMBY (not in my backyard) related costs that tend to plague major transmission projects. Moreover, unlike oil and gas pipelines, it’s impossible to control whose electricity is flowing on whose power line. Electricity flows through the entire grid at close to the speed of light, going where it pleases based on the voltage and resistance between various nodes of the grid. For this reason, the cost of transmission lines is typically socialized, even where electricity market competition has been introduced. This is good for raising the capital required to build the transmission infrastructure we all need, but it can also introduce partisanship and bureaucracy, slowing the whole process down.


Nevertheless, experience shows us that if government and private industry get their act together and carve out a path for renewable energy transmission lines, the wind energy developers will follow. In 2008, Texas allocated $4.93 billion dollars for the CREZ (Competitive Renewable Energy Zones) transmission project, which connects West Texas and the Panhandle to the population centers of Dallas-Fort Worth, San Antonio, and Austin. While the final price tag of the project climbed to $6.8 billion, it has helped Texas maintain its decisive lead in total installed wind energy among the 50 states. And there’s plenty of room to spare. The 3,600 miles of new lines can deliver up to 18,500 megawatts of power from West Texas to the state’s cities, about 50 percent more than the amount of wind power installed in Texas today. In fact, Texas grid operators are currently reviewing 21,000 megawatts of new wind projects, including a planned 1,100-megawatt wind farm near Lubbock that will be the nation’s largest.


While new transmission lines may be costly, in many regions of the U.S. they are a required precursor to unlocking wind energy’s true potential. The example of Texas shows that if we build new lines, the wind developers will follow. States that wish to encourage renewable energy development should work to invest in the requisite transmission infrastructure, so that wind energy growth is not held back by external constraints.


Image credits: ProPublica, National Renewable Energy Laboratory (NREL), ERCOT



To Unlock Wind, Build Transmission Lines Linking the Plains to the Cities

Monday, 12 May 2014

Canadian-Saudi JV to Build $5 Billion Solar Power Installation in Nigeria

While Nigeria worldwide is known as Black Africa’s largest hydrocarbon exporter, the state is also looking into renewable energy for indigenous use.


Nigeria’s Delta State’s solar initiative follows the May 6 Federal Government signing the Foreign Investments Protection Agreement (FIPA) with Canada to improve the climate for Canadian investing in Nigeria. Delta State Government signed a memorandum of understanding (MOU) with Canada’s Skypower FAS Energy to build a $5 billion, 3,000 megawatt facility in the state.


SkyPower FAS Energy is a joint venture between Toronto-based SkyPower Global and Saudi Arabia’s FAS Energy. Established in 2003, SkyPower FAS Energy has built facilities generating over 25,000 megawatts worldwide, producing over 219 million kilowatt hours of clean electricity to date.  FAS Energy is a subsidiary of Fawaz Alhokair Group, one of the leading groups of companies in the Kingdom of Saudi Arabia focusing on retail and real estate business sectors.


Nigerian Minister of Industry, Trade and Foreign Investments Olusegun Aganga said, “Skypower will deploy first in Delta State which has taken the lead because of the enormous work the State has put in to ensure the realization of the renewable energy program.” 


Related Article: Nigeria’s Missing Oil Money Sparks Political Crisis


SkyPower FAS Energy President and CEO Kerry Adler said, “This is truly a proud moment for SkyPower FAS Energy. Global partnerships such as these are key to bringing together extensive expertise from around the world. The signing of these landmark agreements demonstrates the shared vision of a partnership that will further stimulate the vibrant, fast-growing Nigerian economy and substantially impact the state and country’s GDPs, resulting in increased employment and skills training. We applaud the leadership of the Delta State and Federal Nigerian governments for embracing this initiative and demonstrating their continued commitment to reduce carbon emissions and harness the proven power of solar PV.”


Lauding the agreement Nigeria’s Federal Ministry of Power Permanent Secretary Godknows Boladei Igali said, “The Nigerian Government is pleased to partner with SkyPower FAS Energy and we look forward to creating more power and more jobs for the people of Nigeria. Foreign investment in Nigeria helps build the economy and strengthen international ties with a well-respected and viable partner such as SkyPower FAS Energy.” Delta State governor Emmanuel Eweta Uduaghan was equally enthusiastic, commenting, “Delta State is pleased to sign this agreement with the world’s largest solar developer, SkyPower FAS Energy. It represents a continued effort to provide even more clean and renewable energy that can be sustained for decades to come. Delta State: beyond oil into solar.”


Solar power is well suited to Nigeria. As Nigeria is in the tropics, it has only two seasons a year, a rainy and dry season. Accordingly, Nigeria’s greatest solar energy generation potential occurs during the dry season, which last from December to May, while solar energy can only be generated at lower levels during the rainy season due to the reduced amount of sunshine.


Related Article: Interest In Ocean Wave Energy Growing


SkyPower FAS Energy project is expected to begin commercial operation in phases starting in 2015.


While the Delta solar project is a Canadian-Saudi Arabian joint venture, Nigeria’s solar initiatives dovetail with U.S. President Barack Obama’s “Power Africa” initiative, announced on June 30, 2013, which is intended to “build on Africa’s enormous power potential, including new discoveries of vast reserves of oil and gas, and the potential to develop clean geothermal, hydro, wind and solar energy.”  The initiative will provide increased opportunities for U.S. power companies, as U.S. firms are leaders in commercial solar power development. As the “Power Africa” initiative has already identified Nigeria as a “partner country,” is seems likely that U.S. renewable energy companies will shortly join the U.S. oil and natural gas firms already operating there.


By John Daly of Oilprice.com



Canadian-Saudi JV to Build $5 Billion Solar Power Installation in Nigeria

Wednesday, 19 February 2014

Build Your Own Solar Panel: Generate Electricity from the Sun.

Whether you’re trying to get off the grid, or you just like to experiment, Build Your Own Solar Panel has all the information you need to build your own photovoltaic panel to generate electricity from the sun. Now available for the first time in print, this revised and expanded edition has easy-to-follow directions, and over 150 detailed photos and illustrations. Lists of materials, tools, and suppliers of PV cells are included. Every-day tools are all that you need to complete these projects.
Build Your Own Solar Panel will show you how to:
Design and build PV panels,
Customize panel output,
Make tab and bus ribbon,
Solder cell connections,
Wire a photovoltaic panel,
Purchase solar cells,
Test and rate PV cells,
Repair damaged solar cells,
Work with broken cells,
Encapsulate solar cells.


Click Here For More Information



Build Your Own Solar Panel: Generate Electricity from the Sun.